Projects of wooden houses

projects of wooden houses

Choosing a wooden house project

Projects of wooden houses.

Experience 20 years.

Objects in Russia and abroad.

The Erker company has designed more than 300 houses. Some of them, you can see on the site. The number of hosted projects will increase. Each project can be made from logs of different diameters. and assemble in a mirror image without changing the log specification. On all projects, you can change the type and geometry of the roof. This is a standard assignment for an architect.

Some houses were built in a combined design – the first floor is log, the second is frame. Or, before the Mauerlat – log cabins, above – frame ones. This is done in order to avoid conflict in the rafter system. The reason for this is the drying out of the logs and shrinkage. On houses with complex roof geometries, sometimes it is impossible to carry out roofing work without interruption. You have to make a choice between a temporary roof for a year, or the creation of a frame and a rigid rafter system. Also, some houses, at the request of the Customers, were built partly from foam concrete and partly from wood.

The number and volume of logs for the same project may vary, depending on the design and diameter of the logs. The greater the thickness, the larger the volume of the logs included. In order to find out the price of the project, a set of materials for the house, the cost and timing of construction – contact us.

 

...

This is a unique website which will require a more modern browser to work!

Please upgrade today!